01The contract itself, 18 sections with 1,285 fill-in fields, as a PDF you can type into
02A 46-line pre-existing condition survey with a photograph reference against every line, signed by the customer before the trigger is pulled
03A 35-line surface-type inventory and a method election made per surface, with the risk explained and recorded
04A test-patch record and an initialled page of what may not come off
05A 20-line itemized estimate with a page of what the price assumes
06A product disclosure listing what is in the van, with the safety sheets located
07A water-source, power and site-services page filled in before the rig is set down
08A wash-water section recording where the water goes, what the local office said, who asked and when
09A 25-line site protection checklist run as you set up
010A before-and-after photograph log with a consent page
011A pre-existing condition limitation built on the survey, with a damage-report procedure agreed in advance
012A recurring service schedule with a visit log
013An invoice and a completion walkthrough