01The contract itself, 15 sections with 1,024 fill-in fields, as a fill-in PDF you can type into
02A 24-question page on the rules where you work, plus a 20-line record of exactly what the utility told you about this address, with a name, a date and a reference number
03A 24-area site survey and a 28-line hazard-assessment checklist, each with a photograph reference against every row
04A 26-line permit-verification record and a per-tree permit status table, filled before the work is scheduled
05A 14-row tree inventory that numbers every tree once and carries that number through the schedule, the permit record and the invoice
06A debris and stump-grinding addendum with a measured depth per stump, and a page saying in advance what grinding does not do
07An 18-line property protection plan, a pre-work condition record, and a damage-waiver page that arrives blank by design, structured for the paragraph your own lawyer writes
08A priced schedule, an invoice, a change-order log, a per-day site record and a 14-line completion walkthrough